Case Studies

Enterprises Data Center

Enterprise DC (Brownfield DC) – Facility summary
  • Total DC Area- 2900 sq. ft.
  • Designed rack capacity : 6kW
  • Number of racks : 46
  • Supply grills used – 46 No’s
  • Return air grills used- 41 numbers
  • 20TR-3 No’s of PAHU (All are operational without standby)-210kW cooling capacity
  • Ceiling return air path used for recycling of air

Facility DC Summery: Proposed Design Parameters for new Data center

  • Approx. DC area is 4400Sq. ft. (Including PAC room)
  • Current IT load planned – 170kW
  • Space cooling load : 65kW, (Total cooling load: 235kW)
  • UPS : 1x450kVA and 1x350kVA
  • Future expected expansion – 100kW additional (Total IT load : 270kW)
  • Number of racks – 110 (20no’s – 3phase & 90no’s – 1phase racks)
  • Ceiling return distribution system used for recirculation air
  • Bottom through CRAC in use
  • Designed with 8 No’s of 22TR CRAC units : DX Type
  • 6 CRAC units operational with 2 standby

Facility DC Summery:

  • This is brownfield data center, with sq ft area : 8352
  • Current IT load planned – 790kW
  • Per rack load varies from 3kW to 6kW
  • Space cooling load : 116kW
  • Total cooling load : 906kW
  • Installed cooling capacity : 22no’sx30TR
  • Number of racks – 252
  • Ceiling return distribution system used for recirculation air
  • Bottom through CRAC in use
Facility DC Summery: Brownfield Data center
  • Data center area Sq. ft. : 2347
  • Total no’s of racks : 60
  • Installing UPS capacity : 3x500kVA
  • Data center UPS load (IT load) – Presently : 202
  • Installed cooling capacity : 185/660
  • PAHU units 43TRx2 No’s : 86/301
  • DX units 33TRx3 No’s : 99/346
  • No’s of supply grills : 52
  • No’s of Return air grills : 54
  • Air distribution system : Ceiling & Room return

Would You Like To Start A Project With Us?